Panther Creek Wind Farm (Phase I and II)– Big Springs, TX
• Project Owner - E.On (Airtricity)
• WTG Model - GE 1.5 XLE Wind Turbine Generators
• Total MW - 258
• Interconnect Utility / Voltage - TXU, 345 kV
• Challenges / Unique aspects - 60 miles of roads and collection system. Project area covered 50 square miles.
TVIG was the BOP general contractor (roads, foundations, turbine erection, collection system); 172 turbines.

